Aero Service

Provided as an air decking service or dry hire, MTi Group’s Aero unit installs a stable, accurately placed BlastBag Aero’s in water filled holes quickly, safely and reliably.

With the current strain on resources and demand for production, MTi group provide a complete solution from supply to installation With equipment hire agreements available.

One of our experienced and competent team members will provide the training, materials and/equipment to turn any loading plan into a reality, irrespective of hole condition. Engineered to the MDG15 standard the Aero Unit boasts a semi automated control system that ensures simplicity and reliability. The computerised control system will sense the depth of submergence and compensate the pressure of the deck accordingly to ensure that a competent plug is achieved every time. This particular unit is compliant with relevant standards, is the first of its kind and has the capability to install the patented BlastBag Aero up to 60m in holes as large as 270mm.

A quick installation ensures there is no lag between decking and loading allowing users the ability to seamlessly integrate the Aero Service as part of any loading process to facilitate:

  • Improved wall control
  • Eliminates dewatering
  • Reduced loading costs
  • Labour savings
  • The desired outcome

Endorsed and embraced by operations in the Hunter Valley, MTi group extends this technology to the Bowen Basin. Don’t let water dictate your blast plan call MTi Group for more information.


Images

Wieght & ControlControl

Multimedia

  1. Open Pit Catalogue (1854KB)
  2. Underground Catalogue (1558KB)

 Literature

  1. Aero Service (590KB)

For engine starting equipment contact: Multi Torque Industries